Location
Plantation, FL
Description
The KEITH Team, under its continuing services contract with the city, was successfully retained to provide a full range of engineering services for the City of Plantation Drainage Zone 2 to provide an evaluation of the existing stormwater system and develop a Capital Improvement Program (CIP) specifically for this Drainage Zone. The final product will be compiled in a Stormwater Master Plan. KEITH will leverage its expertise in hydrology and hydraulics modeling to evaluate the overall existing stormwater system, identify potential areas at risk of flooding and evaluate future required stormwater system upgrades in order to improve the flood resiliency for the City and its residents. The proposed improvements prepared by KEITH will adhere to the respective federal, state and local regulations to meet water quality and quantity requirements. The final report will build upon past studies and models, data, permit conditions, and recently completed and ongoing projects and initiatives. The culmination of the study's effort will be presented in the new and comprehensive stormwater master plan that establishes a policy framework, integrates resiliency, conducts vulnerability analysis, and provides a prioritized improvement program that ensures the integrity of the City's future is protected for the generations to come.