Location

Fort Lauderdale, Florida

Description

Through the professional consultant services contract with the Broward County Aviation Department for the Fort Lauderdale-Hollywood International Airport and North Perry Airport, the KEITH Team provided resident project representative (RPR) services to monitor the construction of the Runway 10R improvements at North Perry Airport (HWO). The project’s scope includes pavement and electrical demolition of portions of the western sections of Runway 10R and Taxiways Lima and Mike at North Perry Airport (HWO). The runway and taxiways will be extended approximately 200 feet further west and a new north-south taxiway, Taxiway Alpha, will be constructed to connect them. A new run-up pad will be constructed south of Taxiway Lima. New runway/taxiway edge-lights, airfield guidance signs, junction cans, conduits, conductors, pavement striping, and sodding will be installed.

More about HWO Runway 10R Safety Enhancements

The KEITH Team’s role in the project further extended to the preparation of the project’s Construction Management Plan that followed FAA formatting and that included an outline of the project scope of work, detailed description of the phasing of construction, identification and qualification of the key project personnel, required field and laboratory testing procedures, and quality assurance procedures to be followed.