Location

Broward County, Florida

Description

KEITH holds an ongoing engineering services contract with Broward County Water and Wastewater Services for new septic tank elimination program which consists of short sanitary sewer runs to serve small pockets of previously unserved properties. KEITH is providing engineering services for water distribution, wastewater collection, and storm water collection systems. As the Prime consultant, KEITH is providing design and construction support services throughout the county related to the septic tank elimination program.

More about BCWWS

Septic Tank Elimination Program projects under this contract include District 3A STEP Area 3A-N Design and Construction. This project entails approximately 36 septic tank eliminations and incorporation of a new gravity sewer system lift station in the City of Hollywood (District 3A-N) on SW 33rd Avenue, SW 32nd Terrace, SW 33rd Terrace, and the north half of Stirling Road (SR 848). This project was divided in two phases: preliminary analysis to select a lift station and the design/procurement/construction services to implement the preliminary analysis; District 1 STEP Area 3A-H: This project entails the construction of approximately 400 LF of 8” PVC watermain, maintenance, access structures, and associated service lines and cleanouts. The project will eliminate approximately 50 septic tanks from the adjacent mobile home park. The proposed gravity sewer will be located on Griffin Road and SW 24th Avenue, District 3A STEP Area 3A-E1 and E2. This project will extend public sanitary sewer to properties located along SW 40th Avenue from an existing gravity manhole located at the Northeast corner of SW 40th Avenue and SW 50th Street in Dania Beach (Area 3A-E2). This project entails the construction of approximately 700 linear feet of 8” PVC, 2 sanitary sewer maintenance access structures and associated service lines and cleanouts. Additionally, this project includes a new sanitary sewer service lateral to connect the existing land use at 5020 S State Road 7 to the existing WWS gravity sanitary sewer system located on the abutting SW 45th Avenue/SW 50th Street roadways (Area 3A-E1). The proposed project has the potential to eliminate 5 septic tanks; District 3A STEP Area 3A-D: The project entails the construction of approximately 5,000 linear feet of 8” PVC gravity sewer, maintenance access structures and associated service lines. The proposed project has the potential to eliminate several septic systems that currently serve businesses in an industrial park. District 3A STEP Area 3A-L1: This project will extend public sanitary sewer to properties located at the northwest corner of Stirling Road and SW 25th Avenue from an existing gravity manhole located in SW 25th Avenue. The project entails the construction of approximately 295 linear feet of 8” PVC, 2 sanitary sewer maintenance access structures and associated service lines and cleanouts. The proposed project has the potential to eliminate 2 or 3 septic tanks and extend public sanitary sewer to 2 vacant lots; District 3A STEP Area 3A-B: This project entails the evaluation and selection of a sewer system and utility corridor to serve business properties in a boat marina entered exclusively through Marina Road from West SR84. This project has the potential to eliminate 5 septic tanks from the existing marina business west of Secret Woods Nature Center. This project includes the evaluation of 2 public sewer system design options. District 3A STEP Area 3A-F1: The project will extend public sanitary sewer to properties located along SW 22nd Avenue, SW 22nd Terrace, SW 21st Avenue/Anglers Road, and SW 42nd Street from an existing gravity manhole located at the northwest corner of SW 22nd Terrace and SW 42nd Street. The project entails the construction of approximately 1200 linear feet of 8” PVC, 5 sanitary sewer maintenance access structures and associated service lines and cleanouts. In addition, the project also entails approximately 350 LF of 2”-4” low-pressure force main. The proposed project has the potential to eliminate 4 septic tanks. District 1 STEP Area 1-B: The project will extend public sanitary sewer to properties located along Commercial Boulevard and NW 37th Avenue from an existing gravity manhole located at the northeast corner of property addresses 3833 Commercial Boulevard. The project entails the construction of approximately 1250 linear feet of 8” PVC, 3 sanitary sewer maintenance access structures and associated service lines and cleanouts. The proposed project has the potential to eliminate 7 septic tanks. 100898 Hillsboro Pines: This project entails the construction of approximately 800 F of 8” gravity sanitary sewer main, 3 maintenance access structures, and associated service lines and cleanouts. The project will eliminate 7 septic tanks from existing single-family residential neighborhood on NW 49th Lane and NW 75th Court in unincorporated Broward County, where the new utilities for the project will be constructed.